Hazard Identification and Risk Assessment to Eliminate/Reduce Risk Levels in Mivan Type Construction Unit

Authors

  • Dinesh Navin Sekar M.E. Student, Department of Mechanical Engineering, SRM Valliammai Engineering College, Chennai, India
  • S. Sivalingam Assistant Professor, Department of Mechanical Engineering, SRM Valliammai Engineering College, Chennai, India

Keywords:

Construction safety, HIRA, Risk matrix, Mivan construction

Abstract

The foremost aim of the project is to prevent the occurrence of any Incident/Accident in Mivan Shuttering construction site by completely understanding the Nature of Work and its perspectives through the detailed process of Hazard Identification and Risk Assessment (HIRA) and thereby providing Control Measures accordingly to reduce the high-risk levels prevailing in the area.

Downloads

Download data is not yet available.

Downloads

Published

23-04-2023

Issue

Section

Articles

How to Cite

[1]
D. N. Sekar and S. Sivalingam, “Hazard Identification and Risk Assessment to Eliminate/Reduce Risk Levels in Mivan Type Construction Unit”, IJMDES, vol. 2, no. 4, pp. 10–12, Apr. 2023, Accessed: Dec. 03, 2024. [Online]. Available: https://journal.ijmdes.com/ijmdes/article/view/121